Test your API 1184 knowledge with 10 interactive sample practice questions. This module matches the practice-mode experience in the I4I Academy question bank—after you select an answer, you’ll immediately see whether it’s correct along with the corresponding API 1184 section reference so you can verify the requirement and learn more efficiently. For multi-select questions, choose all that apply, then click Check Answer to view your results and references.
Mixed format: some questions are single-choice (instant feedback), and some are multi-select (choose all that apply, then click Check Answer). Scoring is based on your first attempt only.
Q1. During stormwater management facilities construction, which item is specifically a reporting requirement (not a monitoring/verification item)?
Q2. (Select ALL that apply) Which items are explicitly part of hydrostatic testing readiness steps covering preparation and winter conditions?
Q3. Which documentation item appears as a monitoring step in test head removal/replacement and is also explicitly listed as a reporting requirement?
Q4. (Select ALL that apply) Which items are explicitly called out in hydrostatic testing reporting requirements, rather than being a drying-method monitoring check?
Q5. Which action is performed after backfill to confirm integrity and is also specifically captured as a reported test result?
Q6. (Select ALL that apply) Which items directly address avoiding shorts/broken continuity/unintended bonding across cathodic protection installation controls and grounding considerations?
Q7. Which activity is the one where API 1184 explicitly calls out thermite device safety and also expects monitoring of thermite weld workmanship?
Q8. (Select ALL that apply) Which are test report deliverables (not progress reports)?
Q9. Which pair of safety controls is explicitly shown in both the building lighting inspection inputs and the AC electrical systems safety concerns?
Q10. (Select ALL that apply) Which statements are true for both building lighting monitoring and cathodic protection monitoring sections in API 1184?
Score is based on the first answer you submit per question (first radio selection or first “Check Answer” click).